Location Mililani, Oʻahu
Project Size 5 dock pits · ~500 SF freezer slab
Year 2026
Status Under Construction

About This Project

Walmart needed a bigger walk-in freezer and five new loading-dock pits built inside a store that never stopped serving customers.

Warrior’s crew is saw-cutting and demoing the existing slab, excavating and forming a new insulated freezer slab with vapor barrier and rebar, and rebuilding all five dock leveler pits with new formwork and reinforced concrete. Framing, Level 4 drywall, and new overhead doors close out the interior work — all of it scheduled around the store’s hours so shelves stay stocked and customers never see a disruption.

The result taking shape: an expanded freezer and five dock pits built to warehouse-grade tolerances, without costing Walmart a single day of operation.

Scope of Work

  • Freezer expansion slab
  • 5 new dock leveler pits

Project Photos

Finished rebar mesh floor grid for dock leveler pit, Walmart MililaniFinished dock leveler pit rebar mesh, interior view, Walmart MililaniRebar and formwork for a new dock leveler pit, Walmart MililaniDock leveler pit rebar and formwork, wider view, Walmart MililaniDock leveler pit rebar mesh with leveling beam, Walmart MililaniExcavator digging a new dock leveler pit, Walmart MililaniDock leveler pit excavation detail with crew on site, Walmart MililaniFreezer expansion slab excavation at Walmart Mililani, exposing red Hawaii soilFreezer expansion slab excavation in progress, Walmart MililaniReinforced rebar mesh for new freezer expansion slab, Walmart MililaniFreezer expansion slab rebar mesh ready for concrete pour, Walmart MililaniFreezer slab rebar mesh and vapor barrier prep, Walmart MililaniFreezer expansion slab formwork and rebar, alternate angle, Walmart MililaniNew wood framing for freezer expansion wall, Walmart Mililani

Project Timeline

1

Demolition & Excavation

Approx. 8 weeks overall

Saw-cut and remove concrete at the freezer footprint and all five dock leveler pits, remove existing door framing, and excavate. All customer-area work is scheduled at night.

2

Concrete & Masonry

Form and pour the insulated freezer slab over a vapor barrier, rebuild the five dock pits with formwork, rebar and reinforced concrete, and complete localized CMU repairs.

3

Framing, Doors & Insulation

Metal-stud framing for the freezer expansion walls, insulation, Level 4 drywall, owner-furnished overhead doors, dock bumpers and strip doors.

4

Punch List & Paint

Final punch list and paint to match existing store finishes.